Vancouver, British Columbia (December 6, 2010) – Tahoe Resources Inc. (“Tahoe” or the “Company”) (TSX: THO) announced today that it has entered into an agreement with a syndicate of underwriters led by GMP Securities L.P. (the “Underwriters”), pursuant to which the Underwriters have agreed to purchase, on a bought deal basis, 21,704,080 common shares (the “Common Shares”) of the Company, at a price of C$14.10 per Common Share (the “Offering Price”) for aggregate gross proceeds to the Company of C$306,027,528 (the “Offering”).

The Company has agreed to grant the Underwriters an over-allotment option to purchase up to an additional 3,255,612 Common Shares at the Offering Price, exercisable in whole or in part, at any time on or prior to the date that is 30 days following the closing of the Offering to cover over-allotments, if any, and for market stabilization purposes. If this option is exercised in full, an additional amount of approximately C$45,904,129 will be raised pursuant to the Offering and the aggregate gross proceeds of the Offering will be approximately C$351,931,657.

Goldcorp Inc. has indicated that they intend to subscribe for such number of Common Shares from the Offering that will maintain their current ownership position of 41.2%.

The Common Shares will be offered by way of a short form prospectus to be filed in all of the provinces of Canada, other than Québec.

The Company intends to use the net proceeds to fund the advancement and development of the Escobal Project, for acquisitions and for general corporate purposes.

The Offering is expected to close by December 24, 2010 and is subject to certain conditions including, but not limited to, the receipt of all necessary regulatory and stock exchange approvals, including the approval of the Toronto Stock Exchange and the applicable securities regulatory authorities.

The Common Shares have not been, nor will they be, registered under the United States Securities Act of 1933, as amended, or any state securities laws, and may not be offered or sold in the United States, or for the account or benefit of any person in the United States, absent registration or an applicable exemption from the registration requirements. This press release shall not constitute an offer to sell or the solicitation of an offer to buy any Common Shares in the United States, or in any other jurisdiction in which such offer, solicitation or sale would be unlawful.

About Tahoe Resources Inc.

Tahoe’s strategy is to develop the Escobal Project into a profitable mining operation and to position itself as a leading silver producer with high quality, low cost assets in the Americas. Additional information can be found on Tahoe’s website: www.tahoeresourcesinc.com

# # #

Forward Looking Statements
This news release contains “forward-looking information” within the meaning of applicable Canadian securities legislation, which is also referred to as “forward-looking statements.” Wherever possible, words such as “plans,” “expects,” or “does not expect,” “budget,” “scheduled,” “estimates,” “forecasts,” “anticipate” or “does not anticipate,” “believe,” “intend,” and similar expressions or statements that certain actions, events or results “may,” “could,” “would,” “might” or “will” be taken, occur or be achieved, have been used to identify forward-looking information. In particular, this news release describes future events and conditions related to Tahoe’s plans for exploration and studies at the Escobal project. Forward-looking information is based on management’s reasonable assumptions, estimates, expectations, analyses and opinions on the date of this news release. These are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, Tahoe’s ability to carry on exploration and development activities, the timely receipt of required approvals, the price of silver and other metals, Tahoe’s ability to operate in a safe, efficient and effective manner and Tahoe’s ability to obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Tahoe’s actual results, programs and financial position could differ materially from those anticipated in such forward-looking statements as a result of numerous factors, many of which are beyond the Company’s control. These factors include, but are not necessarily limited to, results of exploration activities and development of mineral properties, the interpretation of drilling results and other geological data, the uncertainties of resource and reserve estimations, receipt and security of mineral property titles, receipt of licenses to conduct mining activities, country risks, project cost overruns or unanticipated costs and expenses, the availability of funds, fluctuations in metal prices, currency fluctuations, and general market and industry conditions. There is no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on this information. Tahoe does not undertake to update any forward-looking information, except as, and to the extent required by, applicable securities laws. For more information about the risks and challenges of Tahoe’s business, investors should review Tahoe’s prospectus available at www.sedar.com.

For further information, please contact:
Tahoe Resources Inc.
Ira M. Gostin, Business Director
investors@tahoeresourcesinc.com
Tel: 775-448-5807
Fax: 775-562-8888

# # #

NOT FOR DISTRIBUTION TO U.S. NEWS WIRE SERVICES OR DISSEMINATION IN THE UNITED STATES.

read more

TAHOE RESOURCES ANNOUNCES UPDATED NI 43-101 RESOURCE AND POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR ESCOBAL PROJECT
(PDF)

VANCOUVER, B.C. (November 29, 2010) – Tahoe Resources Inc. (TSX: THO) is pleased to announce the completion of an updated National Instrument (NI)43-101 compliant resource estimate and an independent Preliminary Assessment (PA) for its 100% owned Escobal Project in southeastern Guatemala. The PA defines a 3,500 tonne per day underground mining operation which would produce metals concentrates with very high silver content.

Highlights (all figures in U.S. Dollars)

  • Significantly enhanced resource confidence: Indicated silver resourcehas beenexpanded by 144% to245.2 million ounces at 500 g/t average grade.Inferred silver resource amounts to71.7 million ounces at 271 g/t average grade.
  • Feasibility-level metallurgical testing has confirmed recoveries averaging87% for silver and 75% for gold in metal concentrates.
  • Mine life is18 years at a planned production rate of 3,500 tonnesper day, with direct employment of approximately 500 employees in Guatemala.
  • Years one through five production averagesover 19 million silver ounces per yearat a total cash cost ofless than $3.00 perounce silver(net of by-product credits)which would makeEscobal one of the largest and lowest cost silver mines in the world.
  • After-tax net present value at a 5% discount (NPV5) amounts to $ 1.729 billion.
  • After-tax internal rate of return (IRR) is¬51% on an initial capital cost of $326.6 million with a payback of 1.5 years.
  • Over 90% of the project surface rights have been acquired, with the remainder under negotiation or under contract.
  • Significant upside remains in the Escobal vein trend and in other regional opportunities.

“We are extremely pleased with the Preliminary Assessment which projectsEscobalto beone of the world’s premier silver mines in terms of size, cost and economics,” said Kevin McArthur, President and Chief Executive Officer of Tahoe Resources. “The project design incorporates features which will provide the highest levels of environmental protection, workforce safety and operating efficiency, while minimizing community impacts. It is our intent to responsibly build this mine for the benefit of all stakeholders – governments, employees, communities and shareholders. We are now very focused on completing the remaining permitting and feasibility efforts leading to a construction decision in early 2012.”

Updated Mineral Resource Estimate1
The Escobalvein has been drilled along a strike length of approximately 1,700 metresand a vertical extent of 800 metres. The resourceestimate was updated by Mine Development Associates (MDA) incorporating data from nearly 12,000 samples from 220 diamond drill holes totaling 61,469metres.

The mineral resource estimate for the Escobal deposit contains 245.2 million ounces of silver classified as Indicated resources and 71.7 million ounces of silver classified as Inferred resources, with significant amounts of gold, lead, and zinc reported in both resource categories. A summary of the Indicated and Inferred resources, using a cut-off grade of 150 grams per tonne silver equivalent, is provided in the following table (grades refer to average grades):

MDA modeled and estimated the Escobal deposit resources by refining the geologic model, evaluating the drill data statistically, interpreting mineral domains on cross sections and level plans, analyzing the modeled mineralization statistically to establish estimation parameters, and estimating silver, lead, gold, and zinc grades into a three-dimensional block model using inverse distance cubed (ID3).

Silver-equivalent Indicated resources total 300.3 MM ounces at an average grade of 612 g/t and silver-equivalent Inferred resources total 95.2 MM ounces at an average grade of 359 g/t.

Preliminary Assessment

The PA calculates aBase Case after-tax NPV5 of $ 1.729 billion, with an after-tax IRR of 51%. The initial capital cost of the project is estimated to be $326.6 million with sustaining capital costs over the remaining mine-life estimated at $ 102.2 million. The payback period for the Base Case is estimated at 1.5 years after reaching commercial production. Economic sensitivities at different metals prices and discount rates were calculated as follows:

Mr. McArthur added, “One feature of the world’s best mines is the ability to repay capital investment in a short period of time. At today’s spot metals prices, expected Escobal payback occurs approximately one year after the start of commercial production – and the low total cash costs should allow the mine to remain profitable through any conceivable market price fluctuations. Furthermore, Escobal is a new discovery with very little regional exploration to-date. We expect to see resource growth over time and have incorporated future expansion possibilities into the design concept.”

Mining and Processing
The PA is based on an underground mine operation, mine backfill plant, tailings filtration, processing and concentrate production facility and the infrastructure capable of operating at 3,500 tonnesper day.

Extraction of the mineral resources will utilizelongholestoping methods, with paste backfill used to fill open voids. The mine will be developed via two primary development declines for the transportation of personnel, equipment, and materials, as well as transport of the mined resources to the surface for processing. Additional primary development will include two ventilation shafts and drifts connecting the primary declines. A total of 13,000 meters of primary and secondary underground development is contemplated during the 18-year mine life. The primary declines will also serve as platforms for exploration and definition drilling during the feasibility phase of the project.

Mineral processing will use differential flotation to produce lead and zinc concentrates for sale to a third-party smelter. Feasibility-level test work completed to date on the sulfide resources demonstrates recoveries of 87% for silver, 75% for gold, 83% for lead, and 83% for zinc, with the majority of precious metals reporting to the lead concentrate. Based on current test results, the lead concentratesare expected to contain very high levels of silver, between 15,000 and 30,000 grams per concentrate tonne, with very little in the way of penalty elements. Concentrates will be bagged and delivered to port in sea containers.

Over the mine life, mine production is expected to total 22.6 million tonnesat average diluted grades of 415 g/t silver, 0.47 g/t gold, 0.71% lead, and 1.22% zinc. Average total cash cost is expected to be $3.05 per silver ounce over the 18-year mine life, net of gold and base metal by-product credits.

Capital Costs
Capital costs for the Escobal Project include all project costs commencing January 1, 2010. The project capital costs were prepared by M3 Engineering and Technology Corporation of Tucson, Arizona. Initial capital costs are summarized as follows:


Sustaining capital costs over the remainder of the mine-life amount to $102.2 million primarily attributed to underground development and equipment replacement costs.

Operating Costs
M3 Engineering also prepared the operating cost estimates, working closely with Tahoe management personnel. Base Case unit costs are as follows:

Project Timeline
The Escobal project feasibility study is underway and is expected to be completed in 2011. Baseline studies and environmental documentation has been ongoing for nearly two years. Permitting for full mine operations is scheduled concurrent with the feasibility study and it is expected that the mine can be fully financed and ready for a construction decision by May 2012.

Underground exploration declines in the East and Central Zones are planned to commence in 2011. An application to amend the current exploration permit is on file with regulatory agencies and permits are expected early in 2011. The exploration declines will allow for efficient in-fill drilling and for deep drilling in the deposit with minimal surface disturbance.

Construction is expected to commence in May 2012, subject to project financing and acquisition of all necessary permits. Production is projected for late 2013 with commercial production being reached in early 2014.

Exploration Program
In 2009 and the first half of 2010, exploration programs at Escobal were designed to improve confidence in the established Inferred resource. This program succeeded in expanding the 2010 Indicated resource by 144% to 245.2 million silver ounces.

Ongoing exploration is designed to meet four objectives: further defining Escobal vein extensions through surface drilling;commencement of theunderground exploration decline in early 2011 to provide drilling platforms for in-fill drilling and deep extensional drilling; upgrading twelve other veins in the district to drill-ready status; and exploring new targets through the regional exploration program. The exploration budget for 2011 amounts to $3.5 million, excluding the underground decline project.

Exploration drilling continues to expand the known limits of the Escobal vein down-dip and laterally under post-mineral cover. Drilling in these areas is testing targets indicated byrecently completedstructural analysis and clay-alteration interpretations of the Escobalvein and surrounding satellite veins. Three diamond drills are currently testing these project targets.
Drilling in 2011 is designed to delineate new ore shoots within the Escobal structure through wider and deeper extensional step-outs. This program will be carried out principally from surface collars with underground drilling planned later in the year when drill stations are in place along the planned exploration decline.

As Escobal transitions into project development in 2011, a portion of our exploration effort will move to a regional focus. Using the geologic model developed at Escobal, prospective areas will be evaluated throughout the region while a more concentrated effort will be made to upgrade and drill viable targets that lie within Tahoe’s currently held concession areas. Twelve veins in addition to the Escobal vein have been discovered on the Company’s concessions. During 2010, clay alteration studies were completed over most of these occurrences and interpretation is underway for determining drill targets for 2011.

Preliminary Economic Assessment Contributors
The Escobal preliminary economic assessment was conducted by M3 Engineering andTechnology Corporation of Tucson, Arizona under the supervision of Conrad Huss, PE, Daniel Roth, PE, and Tom Drielick, PE. The updated resource estimate was completed by Mine Development Associates of Reno, Nevada under the supervision of Paul Tietz, CPG.Huss, Roth, Drielickand Tietz are Qualified Persons as defined by NI 43-101 and are independent of Tahoe Resources Inc. as defined in Section 1.4 of NI 43-101 and Section 3.5 of Companion Policy 43-101CP to NI 43-101. Mr. Tietz verified the mineral resource data herein by conducting a site visit, which included verifying drill locations and survey data, reviewing sample handling, data collection procedures, and independent verification sampling; completing a full audit of the assay database and review of the QA/QC data; and analysis of core recovery and its relationship to metal grades.

Metallurgical testing was performed at FLSmidth-Dawson Metallurgical Laboratories in Salt Lake City, Utah. Pakalnis& Associates of Vancouver, BC conducted the preliminary geotechnical analysis. Consultoria y TecnologiaAmbiental, S.A. of Guatemala City performed the environmental baseline work.

About Tahoe Resources Inc.
Tahoe’s strategy is to develop the Escobal Project into a profitable mining operation and to position itself as a leading silver producer with high quality, low cost assets in the Americas. The PA has been filed with SEDAR and additional information is available on Tahoe’s website: www.tahoeresourcesinc.com.

Tahoe’s shares are traded on the Toronto Stock Exchange under the symbol THO.

###

Qualified Person Statement
This news release has been reviewed by Charles Muerhoff, Licensed Geologist and Technical Services Director for Tahoe Resources Inc., a Qualified Person as defined by NI 43-101.

Cautionary Note
The PA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the Preliminary Assessment will be realized.For a full description of known risks that could materially affect potential development of the project, see the Company’s May 27, 2010 long-form prospectus under the heading “Risk Factors” which are incorporated by reference herein and are available on www.sedar.com under the Tahoe Resources profile.

Forward Looking Statements
This news release contains “forward-looking information” within the meaning of applicable Canadian securities legislation, which is also referred to as “forward-looking statements.” Wherever possible, words such as “plans,” “expects,” or “does not expect,” “budget,” “scheduled,” “estimates,” “forecasts,” “anticipate” or “does not anticipate,” “believe,” “intend,” and similar expressions or statements that certain actions, events or results “may,” “could,” “would,” “might” or “will” be taken, occur or be achieved, have been used to identify forward-looking information. In particular, this news release describes future events and conditions related to Tahoe’s plans for exploration and studies at the Escobal project. Forward-looking information is based on management’s reasonable assumptions, estimates, expectations, analyses and opinions on the date of this news release. These are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, Tahoe’s ability to carry on exploration and development activities, the timely receipt of required approvals, the price of silver and other metals, Tahoe’s ability to operate in a safe, efficient and effective manner and Tahoe’s ability to obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Tahoe’s actual results, programs and financial position could differ materially from those anticipated in such forward-looking statements as a result of numerous factors, many of which are beyond the Company’s control. These factors include, but are not necessarily limited to, results of exploration activities and development of mineral properties, the interpretation of drilling results and other geological data, the uncertainties of resource and reserve estimations, receipt and security of mineral property titles, receipt of licenses to conduct mining activities, country risks, project cost overruns or unanticipated costs and expenses, the availability of funds, fluctuations in metal prices, currency fluctuations, and general market and industry conditions. There is no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on this information. Tahoe does not undertake to update any forward-looking information, except as, and to the extent required by, applicable securities laws. For more information about the risks and challenges of Tahoe’s business, investors should review Tahoe’s prospectus available at www.sedar.com.

For further information, please contact:
Tahoe Resources Inc
Ira M. Gostin, Business Director
investors@tahoeresourcesinc.com
Tel: 775-448-5807
Fax: 775-562-8888

read more

Vancouver, British Columbia (September 20, 2010) – Tahoe Resources Inc. (TSX: THO) is pleased to announce new exploration drilling results on the 100%-owned Escobal project in Guatemala. In June 2010 Tahoe acquired the Escobal project and completed the Company’s Initial Public Offering, ending the second quarter with US$117 million cash and zero debt. These funds will be deployed towards exploration, permitting and engineering studies to evaluate potential development scenarios for the Escobal project. The current concept is to develop a high-grade underground mining operation at approximately 3,500 tonnes per day.

The assay results of 52 drill holes totaling 17,748 meters have been received since the completion of the NI 43-101 resource estimate by AMEC Americas Ltd. in April 2010. The majority of these holes were in-fill drilling designed to provide higher confidence to the prior resource estimate.

In-fill holes, totaling 11,175 meters, were drilled to test continuity of both the Central and East zones and to upgrade the inferred resource. Nineteen in-fill holes (5,592 meters) were completed in the Central zone and 20 in-fill holes (5,583 meters) were completed in the East zone. In-fill drilling results in both areas have corroborated the resource model.

Step-out drilling was initiated in June 2010 to test the extensions of the Central zone and to explore the area between the East and Central zones. Drilling in these areas intersected mineralization laterally and to depth beyond the limits of the current resource model. In the Central zone, widely-spaced step-out holes extended the mineralized structure 120 meters down dip from the previously defined limit. The Central zone now remains open at depth over a strike length of 600 meters. Although the western limit of the Central zone appears to have been defined, additional drilling will be directed to explore for new high-grade shoots further to the west. In the East zone, five holes extended mineralization 50 meters west and 100 meters to depth from the prior defined resource limit.

For the remainder of 2010, ongoing drill programs will continue to explore laterally and to depth in both mineralized zones. In addition, understanding of geologic controls will be tested through focused drilling at known and interpreted structural intersections. To augment this program, SRK Consulting has been contracted to conduct a targeted structural study to characterize controls of the mineralized system and guide future exploration work.

Highlights of the new drill hole intercepts are summarized in the following table. A comprehensive drill hole database and a grade-thickness long section are available on the Company’s Website at www.tahoeresourcesinc.com. Additionally, all drill holes can be viewed in cross sectional and 3D views at Corebox, a link also available on the Tahoe Website.

Escobal Project – 2010 Drill hole Highlights
Escobal Project – 2010 Drill hole Highlights

Escobal Reference September 10, 2010
- Long section
- Assay table
- Collar table

Other Activities
In conjunction with the current surface exploration and drilling programs the Company continues work on the proposed underground exploration program and the economic assessment of the Escobal project. This work includes preparation of permit applications; environmental baseline, hydrologic, engineering and metallurgical studies; and updates to the resource model incorporating drilling results since April 2010. M3 Engineering and Technology Corp. has been contracted to provide engineering services and to prepare the Preliminary Economic Assessment (PA) targeted for the 4th quarter of 2010.

Tahoe’s President & CEO Kevin McArthur said, “We are very pleased with progress on many fronts since the IPO in June. We have significantly enhanced our Guatemalan management and mine-building teams, we continue to expand known mineralization through drilling, and our on-going metallurgical testing is showing strong economic indications. In addition, we are receiving positive feedback from local and federal authorities in our planning and permitting efforts. We are confident that Escobal will develop into a world-class mine in the near future.”

Mr. McArthur added, “We have accelerated our exploration with the addition of two drill rigs in August, and we are making plans to go underground next year. Furthermore, the regional exploration team has commenced work to develop drill targets on the thirteen other veins discovered to date at Escobal. We expect a regional drilling program to commence in 2011.”

About the Escobal Project
The Escobal Project is a recent discovery of high-grade silver, gold, lead and zinc mineralization in southeast Guatemala. The project contains an Indicated Mineral Resource of approximately 100M oz silver, based on 4,570,000 tonnes at a silver grade of 684 g/t and an Inferred Mineral Resource of approximately 176M oz silver, based on 12,800,000 tonnes at a silver grade of 427 g/t. The Mineral Resources are calculated based on 46,333 m of drilling in 175 holes (Source: Mineral Resource NI 43-101 Technical Report – AMEC Americas Ltd. dated April 30, 2010, prepared under the guidance of Mr. Greg Kulla, P. Geo, a Qualified Person.) Tahoe continues ongoing exploration drilling program at the Escobal Project and is conducting metallurgical and engineering studies to evaluate potential development scenarios for the Escobal Project.

About Tahoe Resources Inc.
Tahoe’s strategy is to develop the Escobal Project into a profitable mining operation and to position itself as a leading silver producer with high quality, low cost assets in the Americas. The Guatemalan project team numbers approximately seventy-five employees working towards an anticipated project construction decision by May, 2012. Tahoe’s website is www.tahoeresourcesinc.com

# # #

Qualified Person Statement
This news release has been reviewed by Charles Muerhoff, Licensed Geologist and Technical Services Director for Tahoe Resources Inc., a Qualified Person as defined by National Instrument 43-101. Drill samples are prepared by Inspectorate Laboratories in Guatemala City and analyzed by Inspectorate Laboratories in Reno, Nevada. A Quality Control program of reference standards, blanks, and duplicates is used to monitor the integrity of the analytical results, with duplicate assaying performed by ALS Chemex in Vancouver, BC and Reno, Nevada.

Forward Looking Statements
This news release contains “forward-looking information” within the meaning of applicable Canadian securities legislation, which is also referred to as “forward-looking statements.” Wherever possible, words such as “plans,” “expects,” or “does not expect,” “budget,” “scheduled,” “estimates,” “forecasts,” “anticipate” or “does not anticipate,” “believe,” “intend,” and similar expressions or statements that certain actions, events or results “may,” “could,” “would,” “might” or “will” be taken, occur or be achieved, have been used to identify forward-looking information. In particular, this news release describes future events and conditions related to Tahoe’s plans for exploration and studies at the Escobal project. Forwardlooking information is based on management’s reasonable assumptions, estimates, expectations, analyses and opinions on the date of this news release. These are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, Tahoe’s ability to carry on exploration and development activities, the timely receipt of required approvals, the price of silver and other metals, Tahoe’s ability to operate in a safe, efficient and effective manner and Tahoe’s ability to obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Tahoe’s actual results, programs and financial position could differ materially from those anticipated in such forwardlooking statements as a result of numerous factors, many of which are beyond the Company’s control.These factors include, but are not necessarily limited to, results of exploration activities and development of mineral properties, the interpretation of drilling results and other geological data, the uncertainties of resource and reserve estimations, receipt and security of mineral property titles, receipt of licenses to conduct mining activities, country risks, project cost overruns or unanticipated costs and expenses, the availability of funds, fluctuations in metal prices, currency fluctuations, and general market and industry conditions. There is no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on this information. Tahoe does not undertake to update any forward-looking information, except as, and to the extent required by, applicable securities laws. For more information about the risks and challenges of Tahoe’s business, investors should review Tahoe’s prospectus available at www.sedar.com.

For further information, please contact:
Tahoe Resources Inc.
Ira M. Gostin, Business Director
investors@tahoeresourcesinc.com
Tel: 775-448-5807
Fax: 775-562-8888

read more

News Archives

More Information

Tahoe Resources Inc.
Ira Gostin
(775) 448-5807
investors@tahoeresourcesinc.com